December, 2008 Construction Photos
|
Click on
each picture to see a larger view Horsethief
Reservoir now under construction Construction
Firm: Max Jantz Excavating, Montezuma, KS Construction
Engineering Firm: URS Corporation, Overland Park &
Denver, CO |
|

Construction
has stopped for the winter; compacted soil has been covered with
loose soil for protection.
|

Site
plan showing major components of the project
|
|

When installation of the
60" pipe was complete, it was filled with water and
pressure-tested. |
60" principal
spillway pipe enclosed in concrete |
Construction on the inlet tower |
Inlet tower progresses |
Completed stilling basin
|
Inlet tower under construction
mid-screen; completed stilling basin lower center; siphon pipes
routing water over the dam.
|
Outlet channel emptying into
Buckner Creek
|
Soil removed from the auxiliary
spillway will provide more than 1.5 million cubic yards used in the
dam. |
An existing ravine was located
too close to the downstream toe, so a new channel was excavated
further from the toe, and the old one filled in.
|
Construction will resume in
March, weather permitting
|
|